# Logistics delivered in eight months, customs included

*Source: https://techincglobal.com/case-studies/emjay-international*

> Techincglobal is Sri Lanka’s first and only authorized Frappe Technologies partner. We work with businesses to implement ERPNext, configure it around their processes, develop the functionality they need, and support their teams beyond go-live.

- Organisation: Techincglobal (Techincglobal Consultancy (Pvt) Ltd)
- Position: Sri Lanka’s Frappe partner for enterprise solutions
- Founded: 2018
- Group: SEBSA Group
- Partner status: Certified Bronze Partner, Frappe Technologies
- Location: No. 289/7 D, Lake Road, Malabe, Sri Lanka
- Contact: info@techincglobal.com · +94 707 978 978
- Website: https://techincglobal.com

## Logistics delivered in eight months, customs included

Sector: Manufacturing


A Sri Lankan manufacturer closed a logistics requirement it had pursued for years — integrated to its manufacturing system and connected to ASYCUDA.


### Results

- 8 months — Requirement to go-live
- Zero — Major issues since go-live


### The challenge

Emjay International had been attempting to develop a complete logistics solution for several years without reaching a delivered outcome. The requirement was never a single process: it had to sit alongside the manufacturing solution already running the business, and it had to speak to ASYCUDA for customs declarations. Any solution that solved logistics in isolation would simply relocate the disconnect.


### The approach

We delivered Emjay’s complete logistics requirement on the Frappe platform under the NXTGEN Agile methodology, with the two integration boundaries treated as scoped deliverables rather than late-stage risk. The link into the existing manufacturing solution gives production and logistics one operational picture. ASYCUDA connectivity means customs declarations draw from live transaction data instead of re-keyed spreadsheets.


### The outcome

The solution went live within eight months. It has since carried large transaction volumes without a major issue from the day of go-live — an outcome Emjay attributes to both the robustness of the platform and the delivery capability of the implementation team.


### Client comment

> They successfully delivered the solution within 8 months, with integration into our existing manufacturing solution and connectivity with ASYCUDA. We have experienced no major issues since the day we went live.

— M. Azain Ghany · Director, Business Transformation · Emjay International (Pvt) Ltd


Delivered by the SEBSA and Techincglobal Consortium.

---

Published by Techincglobal. Sri Lanka’s Frappe partner for enterprise solutions. https://techincglobal.com